1st and 2nd stage studies of Jorangarm Bridge

1st and 2nd stage studies of Jorangarm Bridge

Location:

Activity: Irrigation and Drainage

Client: Sistan Baluchistan Road and Transport Department

start date:

Completion Date:

Project Description:

Services: Feasibility study and design

Bridge length:70 m

Road width:7 m

Bridge type:Concrete with rock abutment and steel deck

Status: Under operation